Electrical Start-Up

Verify that UPS voltage of your country corresponds to your
equipment voltage. The default setting is set to 230 V. Output
voltage on the UPS system can be adjusted with the software
"CompuWatch" in steps of 220 Vac, 230 Vac and 240 Vac.
Turn on the PROTECT C. to the mains
1.
2.
Check the correct fit of the UPS and the battery
unit (the casings e.g. have to have the same
dimension).
Now
connect
connectors using the supplied battery connection
cables as shown in the figure above. When
connecting, make sure that you push the plug
quickly and firmly in the battery connectors.
Now connect the input of the UPS to the mains
connection cable provided and plug the mains
connector into a suitable shockproof socket. Avoid
using extension cables and / or adapters. In
particular in the case of high-capacity types, ensure
that the fusing in your sub-distribution is adequately
dimensioned: The 3kVA system for example requires
its own connection with a 16 A fuse. No other loads
should be connected to this circuit!
Activate the mains input circuit breaker. If
necessary switch it to "ON".