Installation
Instructions
[STEP 2 j LEVEL
• Use an adjustable wrench to turn the leveling legs and
raise or lower the product.
• Adjust carefully; the product should be level and plumb
with cabinetry, and should align with adjacent toekick
height.
\\\\
Turn Right t o Lower
/
Turn LefttoRaise
/
[ STEP 3 j CONNECT POWER
,, Connect power cord plug to a properlg grounded
receptacle.
Check to make sure power is on bg opening the door
to see if interior light turns on.
i STEP 4 ] SLIDE PRODUCT INTO
THE CUTOUT
WARNING:
Do not apply pressure or
push against the glass door when moving or installing
these products. Pressure against the glass door will
cause damage.
AVERTISSEIENT
: Ne poussez
jamais et ne mettezjamais de pression sur la porte
en verre quand vous d@lacez ou installez ces
produits. Toute pression sur le verre occasionnera
des dommages.
Carefully slide the unit into the opening. Be careful
not to entangle power cord.
• Make certain that the door protrudes 1" beyond
the surrounding cabinets.
• Check again to be sure the unit is level.
[ STEP 5 j CHANGE THE TOEKICK
• The stainless steel toekick is secured to the back
of the product or inside.
• The toekick has a cutout
on the left and right
sides. Remove
the plug on
the left side
and reinstall
on the right
Move Fill
side. If you
i
Plug to
choose to
Right S ide
install the
_"-.
_ z
stainless
..... - _._::-.
steel toekick,
_
reinstall the plug
on the right side
of that toekick.
• Install original screws and spacers or screws and
spacers supplied with the stainless steel toekick. Install
screws through the spacer standoff, toekick and into
the base as shown.
[ STEP 6 j SET TEMPERATURE
CONTROLS
• The temperature controls are preset. Refer to the
Owner's Hanual for more information. Allow 24 hours
for temperature to stabilize.