Unpacking; Location - GE Digital Energy STS-400-25-3 Installation And Operating Manual

Static transfer switch 400v-25/40/63/100a-3/4-pole
Table of Contents

Advertisement

Digital Energy
Static Transfer Switch

3.2 Unpacking

1. Cut the wrapping bands, and remove the shipping box.
2. Immediately after unpacking carefully check the integrity of the equipment. In case you note
recognizable damage,
• notify the carrier and place of purchase
• contact the nearest Service Center.
WARNING!
DO NOT connect any voltage to the unit
DO NOT put the unit into operation
3. Turn the unit into vertical position and place it on a frame. Screw the pedestal of the STS to the
frame.
4. Recycle the packing material in compliance with all applicable regulations.
3.3

Location

• This STS is intended to be used in a controlled indoor environment and free of conductive
contaminants and protected against animal intrusion.
• Check for sufficient floor loading capacity.
• Avoid placing the unit in direct sunlight or near heat sources.
• It is important that the unit has adequate ventilation. Maintain air movement around and through the
unit. Do not block the air vents.
• The unit must be placed in a sufficiently ventilated area; the ambient temperature should not exceed
40°C (104°F).
• Do not install the STS in an excessively humid environment or near water, relative humidity should not
exceed 90% at 20°C (68°F).
• Avoid spilling liquids or dropping any foreign object into the STS.
OPM_STS_400_25A_100_1GB_V011
In case of recognizable damage:
17
GE DE STS: installation and operating manual 1.1 (GB)
g

Advertisement

Table of Contents
loading

Table of Contents