Table 1-24 Keys used for dates and calendar functions
Keys
If the current date is February 28 2010, what is the date 52 days from now? Cal-
culate the date using the 365-day calendar (actual) and the M.DY settings.
If 360 is displayed, press
Table 1-25 Calculating the date
Keys
G7GgG:J:
VG4
For more information on date and calendar functions, refer to chapter 9,
Calendar Formats and Date Calculations in the HP 10bII+ Financial Calculator
User's Guide.
22
Getting Started
Description
Calculates the number of days between two dates.
Returned result is always calculated based on the 365-day
calendar (Actual).
. If D.MY is displayed, press
Display
Description
2.28
Inputs the date in
the selected
format.
4-21-2010 3
Inputs the
number of days
and calculates
the date along
with the day of
the week.
.