Step 8 Install Implement Rods - GE Monogram ZV48T Installation Instructions Manual

30", 36" and 48" professional vent hoods
Hide thumbs Also See for Monogram ZV48T:
Table of Contents

Advertisement

STEP 8 INSTALL IMPLEMENT
RODS
• Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
• Align implement rod to stand-offs with the screw hole
towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.
• Follow the same procedure on the opposite side.
FINALIZE INSTALLATION
• Install the supplied infrared bulb(s).
• See the Owner's Manual for instructions to test
operation.
Installation Instructions
Screw
Stand-offs
Into
Hood
Use Allen
Wrench to
Secure Rod
to Stand-offs
15

Advertisement

Table of Contents
loading

Table of Contents