Power Outage Simulation Test - Sanyo SANUPS A11J Instruction Manual

5 kva
Table of Contents

Advertisement

Preparation Before Operation
§
7
.
3
P
o
7
.
3
P
o
Perform a power outage test to confirm whether the UPS is working properly.
① Set MAIN MCCB on the front of the UPS to "ON."
SANYO DENKI
SANUPS A11J
After approx. 5 sec.
- STANDBY -
Vi=*** Fi=***
Check that "Green INPUT" has changed from blinking to always on, and then proceed to step ②.
② Press
④ Check that the LCD display and LEDs are in the states shown in the diagram below.
****
25
w
e
r
O
u
t
a
g
e
S
i
m
w
e
r
O
u
t
a
g
e
S
i
m
Green:
Blinking
Lit
.
- STANDBY –
****
3
2
Green: Lit Green: Off
- ONLINE –
u
l
a
t
i
o
n
T
e
s
t
u
l
a
t
i
o
n
T
e
s
t
Green: Off
Red: Off
Green: Off
③ Press
.
[Select]=INV ON
[Back]=Cancel
Red: Off
Green: Lit
Step ① is not necessary if the
procedure in §7.2 "Charging UPS"
was performed beforehand.
Green: Blinking
Green: Off
Red: Off
① Set this to "ON"
INV ON
Control OK
The screen changes
after approx. 1 sec
- ONLINE
****
Green: Lit
Green: Lit
Red: Off
T i p
Lit
.