ii
TAPE DECK ADJUSTMENTS
u
a.
HEAD
REPLACEMENTA
NDHEADA
ZIMUTHADJUSTMENT
(a) HEAD REPLACEMENT
.
Af[er replacement,
demagnetize
the heads
by using a degausser.
.
Be sure to clean [he heads
be[ote
attempting
to make any adjustments.
.
All
wiring
should
be returned
to the original
posilion
after
work is completed
E. HEAD
RIP
HEAD
BLACK
wHITE
RED YELLOW
**
*
I
/
WHiTE
(b) HEAD AZIMUTH ADJUSTMENT
(1)
HEAD
AZIMUTH
ADJ
(2)
(3)
(4)
(5)
b.
(a)
Load the test tape ( VTT-703,
etc., 10 kHz ) for azimuth
adjustment.
Press the PLAY
button.
Use a cross-tip
screwdriver
to turn
the screw for azimuth
.
/
adjustment
so
that the left and right output are maximized.
Press the the STOP button.
Arler completion
of the adjustment,
use thread lock (TB-1401 B)
to secure the azimuth-adjustment
screw.
<<*3
MOTOR
REPLACEMENT
AND
SPEED
ADJUSTMENT
\y/
MOTOR REPLACEMENT
MOTOR SPEED ADJ
/
—
(b) MOTOR
SPEED
ADJUSTMENT
(1) Insert the test tape ( MIT-ill
N, etc., 3000 Hz ).
(2) Press the PLAY
button.
(3) Use a flat-tip screwdriver
to turn the SVR (located inside the rear
of the
motor) to
adjust SVR so that the frequency
counter
becomes 3,000 Hz.
c.
CHECKING
THE
MECHANISM
TORQUES
AND
TENSION
Clean the head, caps!an
and pinch roller before making any measurement.
Measurement
Take-up torque
Back tension
Tape
tension
Cassette
for
PLAY: TW-21 11A
Drive-power
cassette
PLAY: TW-21 11A
measurement
F. FWD/REW:TW-2231
TW-2412
PLAY
30-60
gr.cm
2.O-4.5 gr.cm
60
gr or more
F.FWD
55-
120gr cm
REW
55-
120gr cm
-7-