Prepare Countertop Cutout Opening - Whirlpool Electric Down Draft Surface Unit Installation Instructions Manual

Electric down draft surface unit
Table of Contents

Advertisement

8
Prepare Countertop
Cutout Opening
EXCEED
A MAX -
30"
MIN.
1
LOCATION
/
APPROXIMATE
\
\
OF JUNCTION
/
\
I
#
A
Provide Electrical
Install
the
junction
box
under
the
cabinet
and
run
the
Connection
1'20/240
Volt,
(or 120/208
Volt
if specified
on nameplate)
AC wire from
the maln circuit
panel.
(DO NOT connect
the
wire
to the circuit
panel at this time.
For basic information,
see Electrical
Requirements
on page 2.
3

Advertisement

Table of Contents
loading

Table of Contents