TRASH COMPACTOR
INSTALLATION
INSTRUCTIONS
KCS-200
INSTALLER: FINAL CHECK LIST
PLACEMENT OF COMPACTOR
cl
1.
Compactor
placed in convenient
location.
0
2.
Adequate
space allowed for full drawer opening.
cl
3.
Built-in
conversion
and installation
completed:
a.
Properly
positioned
- Level, Aligned
and Square with cabinet opening.
b.
Unit snugly positioned
in cabinet using leveling legs.
C.
A minimum
l/4"
clearance MUST BE MAINTAINED
between compactor
top and
counter
top for service accessibility.
(See Fig. 2).
ELECTRICAL CONNECTION
cl
1.
Properly
fused, 115 volt, 60 hertz branch circuit
of 15 ampere capacity.
0
2.
q
Compactor
properly
grounded.
(3-Prong grounded
receptacle).
3.
All connections
in conformance
with local electrical
code.
OPERATIONAL
CHECK
Cl
1.
Fully open then close drawer to check drawer operation.
0
2.
Check compacting
cycles.
a.
With drawer fully closed, turn key to "start"
and allow compactor
to run one full
cycle (ram goes down, back up, then stops).
b.
Turn key to "start"
a second time, wait approx.
5 seconds then turn key to "stop/
lock"
position
(ram should stop).
cl
3.
c-
Turn key to first position.
(ram should return to "up"
position
and stop).
Check charcoal air filter unit:
a.
With drawer fully closed, push charcoal air filter
switch on.
THANK YOU INSTALLER:
1. Complete
Installation
Check List.
2.
Leave all literature
(Incls. Check List) for customer.
3.
Notify
dealer that electrical
work is completed.
FOR DETAILED INSTRUCTIONS, FOLLOW METHOD DESCRIBED IN THIS FOLDER