f)
Burning process has two steps: Erase and Program; please refer to Fig. 6;
1)
First, the step "Erasing..." will last for some time, or it is failed if it is passed by quickly,
please confirm procedure 2)and begin burning process again;
2)
Then the following step is "Programming...;
3)
A prompt "Pass" will display at last;
g)
A prompt "Pass" will display if burning process is successful, please refer to Fig. 7;
h)
If there are other machines to be burned, remain ISP burning interface and repeat procedures
c)to e)only;
Fig. 5 Option switches
Fig. 6 Option switches
Fig. 7 Successful burning process