Test Screens; Battery Test, General; Quick Battery Test - GE LP 31 Operating Manual

8–10–15–20 kva series 1
Hide thumbs Also See for LP 31:
Table of Contents

Advertisement

g

4.4 TEST SCREENS

These screens show the test procedure, either started from the service menu (front panel keys)
or via the UPS monitoring software (ComConnect Port).
The upper line indicates the kind of test, the second line its proceeding.
Upper lines:
GENERAL SYSTEM
QUICK BATTERY
CALIBRATE BAT
BYPASS
Lower lines:
TEST START
TEST ACTIVATED
TEST SUCCESSFUL
TEST FAILED

4.4.1 Battery Test, general

Automatic test
Manual test

4.4.2 Quick Battery Test

From the standard menu first enter the service menu (press "-" and "enter/reset"
simultaneously during 2 seconds).
Subsequently press "-" until the following screen appears:
QUICK BATTERY
TEST PRESS ENTER
OPM_LPS_31E_8K0_20K_1GB_V010.doc
(Overall test of system).
(Quick battery test).
(Deep discharge battery test).
(Bypass test).
The test will start soon.
The test is running.
The test has been completed successfully.
The test has not been completed successfully.
The LP 31 UPS conducts periodic automatic battery tests to ensure
that the batteries and the wiring are healthy and able to support power
failures.
The tests do not cause any interruption in the function of the unit and
are conducted after every 500 operating hours.
A manual battery test can be activated:
- either through an interface kit, via the ComConnect Interface Port
(please refer to the manual of your interface package), or
- via the front panel: see below.
Key enter/reset confirms the selection, and the screen
shows:
28/40
Operating Manual LP 31 / 8-10-15-20 kVA