Operating Procedure; Start Of Process - Panasonic AN30182A-EVB User Manual

Table of Contents

Advertisement

Regulations
1824S02E
No.
4

Operating Procedure

This section describes how to use Evaluation Board and Serial Controller software.
4.1

Start of Process

1)Connect Evaluation Board to PC with USB Cable. (cf. section 2.2)
2)Supply VBAT=2.5∼5.5V and DVDD=1.7∼3.0V on Evaluation Board.
3)Before using Evaluation Board, Installation of a program to PC is needed.
Please refer to the file : Install Manual of Serial Controller(AN30182A).pdf
If this has ever been done, ignore this step.
4)Start up the Serial Controller software : AN301820_Serial Controller ver1.0a.exe
5)In the opening window, Choose [NEW TYPE(EXUSB_FX2)I2C Control] button.
CHOOSE
6)Serial Controller Software starts.
Note: The parameters above is subject to change for improvement without notice.
2013-05-15
Revised
User's Guide
for Evaluation Board
Figure 8. Starting Window of Serial Controller Software
Automotive & Industrial Systems Company, Panasonic Corporation
AN30182A-EVB
Total Pages
Page
24
9

Advertisement

Table of Contents
loading

Table of Contents