Manuals and User Guides for Huawei FusionModule1000A. We have
2
Huawei FusionModule1000A manuals available for free PDF download: Commissioning Manual, Installation Manual
Huawei FusionModule1000A Commissioning Manual (123 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Storage
| Size: 3.95 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Information
8
General Safety
8
Personnel Requirements
11
Electrical Safety
11
Installation Environment Requirements
13
Mechanical Safety
14
Cooling System Safety
17
Pre-Fab. Module Safety
17
Battery Safety
18
Others
20
2 Precautions for Power-On Commissioning
22
3 General Power-On Commissioning Process
23
4 Preparations for Power-On Commissioning
24
Tool Preparations
24
Reference Documentation
26
Commissioning Personnel Skill Requirements
26
Preparing for the Power Supply and Distribution System Power-On Commissioning
27
Preparing for the Cooling System Power-On Commissioning
28
Preparing for the Management System Power-On Commissioning
29
Preparing for the Fire Extinguishing System Power-On Commissioning
30
5 Check before Power-On
31
6 Power-On Commissioning
35
7 System Commissioning
39
Power Supply and Distribution System Commissioning
39
Switching between Two Power Supplies
39
Commissioning the Logic Load Disconnection (Powering-Off) of the Power Supply System under Normal Temperature
40
Commissioning the Cooling System
41
The Management System Commissioning
41
Preparing for Commissioning the Management System
41
Commissioning the Management System
42
Commissioning the Fire Extinguishing System (Standard)
43
Fire Extinguishing System Commissioning (CE)
54
8 Commissioning Core Components
61
Commissioning the UPS
61
Commissioning the ATS on the 02311FTE-002 and 02311FTC-001 Systems
61
Commissioning the Integrated UPS
63
Commissioning the MDU
67
Commissioning Smart Cooling Products
69
Initial DIP Switch Configuration for T/H Sensors
71
Teamwork Initial Configuration
72
Initial Configuration of Temperature and Humidity
79
Commissioning Monitoring Components
81
Preparations and Webui Login
81
Optional) Commissioning the Ibox and Ibat
85
Setting Ibox and Ibat Parameters
85
Networking Iboxs and Ibats in Wireless Mode
86
Commissioning Access Control Components
87
Optional) Neteco Management
88
Basic Operations before Adding Devices
88
IP Address Preinstallation Planning
88
Obtaining the Neteco Software License
88
Powering on a Server
89
Logging in to the Powerecho
89
Installing the NE Mediation
90
Neteco Menu Settings
91
Logging in to the Neteco Client
91
Loading a Neteco License
92
Creating a Domain
93
Adding a Containerdc
94
Process of Adding a Device
97
Scenarios for Connecting the ECC800 Collector
98
Commissioning Southbound Devices of ECC800
98
Setting and Adding the ECC800 Collector
99
Setting Neteco Parameters
99
Creating the ECC800 Collector on the Neteco
100
Setting the Transparent Transmission Function for the ECC800 Collector
102
Scenarios for Connecting the Server
103
Setting SMS
103
Scenarios for Connecting the LAN Switch
105
Adding the Video Management System
105
Configuring VCN Server Parameters
105
Setting Parameters on the VCN IVS Client
108
Configuring Camera Parameters on the Neteco
110
Registering with the OCX Plug-In
111
Adding a Camera Using Automatic Discovery
114
Commissioning Fire Extinguishing Devices
115
Commissioning Fire Extinguishing Devices (Standard)
115
Commissioning the Fire Alarm Control Panel (Standard)
115
Commissioning the Emergency Lights (Standard)
118
Commissioning Fire Extinguishing Devices (CE)
119
Commissioning the Extinguishant Control Panel (CE)
119
Commissioning the Emergency Light (CE)
119
Optional) Commissioning the VESDA
121
A Acronyms and Abbreviations
123
Advertisement
Huawei FusionModule1000A Installation Manual (108 pages)
Prefabricated All-in-One Data Center
Brand:
Huawei
| Category:
Storage
| Size: 6.93 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Installation Guide Usage
8
2 Site Requirements
9
Site Selection Requirements
9
Field Requirements
9
Optional) Concrete Platform Scenario
9
Optional) Base Installation Scenario
10
Power Supply and Distribution Requirements
11
Grounding Requirements
12
Water Refill and Drainage Requirements
13
Water Refill Requirements
13
Drainage Requirements
13
Pipe Anti-Freezing
14
External Environment Requirements
15
3 Installation Preparations
16
Obtaining Tools and Materials
16
Installation Personnel Requirements
20
Checking the Installation Environment
20
4 Installing Pre-Fab. Modules
21
Optional) Concrete Platform Scenario
21
Determining the Pre-Fab. Module Installation Position
21
Removing the Pre-Fab. Module Protective Cover
22
Hoisting Pre-Fab. Modules
23
Optional) Base Installation Scenario
28
Determining the Pre-Fab. Module Installation Position
28
Removing the Pre-Fab. Module Protective Cover
33
Hoisting and Securing Pre-Fab. Modules
34
Grounding Pre-Fab. Modules
36
5 Installing External Accessories for Pre-Fab. Modules
39
Optional) Installing External Cable Trays
39
Optional) Installing Awnings
41
Optional) Installing Step Ladders
44
6 Installing External Pipes for Smart Cooling Products
47
7 Removing Transport Protection Materials
50
Removing Transport Protection Materials for Smart Cooling Products
50
Removing the Cabinet Sliding Base Fasteners
53
Removing Sliding Door Fasteners
54
8 Installing Devices Inside Pre-Fab. Modules
57
Installing Power Supply and Distribution Devices
57
Optional) Installing Battery Packs
57
Installing Batteries
59
Optional) Installing the Electric Heating Belt
60
Installing Monitoring Devices
64
Optional) Installing ECC800 Accessories
64
Optional) Installing the Wifi Antenna
69
Optional) Installing a Pad
70
Optional)Installing the Ibat
71
Installing Fire Extinguishing Devices
73
Installing CE-Certified Fire Extinguishing Devices
73
Optional) Installing the Fire Cylinder (CE)
73
Connecting the Cable to the Battery of the Fire Control Panel
77
Optional) Connecting a Cable to the ASD Power Box Battery
79
Installing an External Horn Strobe
80
9 Installing Cables Outside Pre-Fab. Modules
82
Connecting Input Power Cables for Pre-Fab. Modules
82
Optional) Connecting Generator Start/Stop Cables (ATS Input)
83
10 Removing Transport Protection Materials from Fire Extinguishing and Monitoring Devices
86
11 Installation Verification
88
A a Basic Installation Operations
90
Cable Installation Techniques
90
Cabling Rules
90
Measuring Cables
91
Laying out Cables
92
Routing Cables through a Plastic-Coated Metal Hose
93
Mounting Cables on the Cable Tray
94
Routing Cables into Feeder Windows
96
Installing DPJ End Connectors
96
Installing Waterproof Metal Connectors
99
Attaching Cable Labels
101
Preparing Cable Terminals
102
B Dimensions of External Cable Trays and Fixed Ladders
105
C Cleaning Pre-Fab. Modules
107
D Acronyms and Abbreviations
108
Advertisement
Related Products
Huawei FusionModule500
Huawei FusionModule2000 V500R002C03
Huawei FusionModule1000A20
Huawei FusionModule1000B V100R003C00
Huawei FusionModule2000-S
Huawei FusionModule500-SU61A12S
Huawei FusionDC1000B
Huawei FusionModule2000 V500R003C10
Huawei FusionModule1000A40 ICT Solution
Huawei FusionModule800
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Network Hardware
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL