Installation - Miele KM 6629 Operating And Installation Instruction

Table of Contents

Advertisement

Installation

Preparing the worktop
 Make the worktop cut-out as shown
in the building-in diagram. Observe
the safety distances (see "Safety dis-
tances").
 Seal the cut surfaces with a suitable
sealant to avoid swelling caused by
moisture. The sealant must be heat-
resistant.
Make sure that the sealant does not
come into contact with the top of the
worktop.
The seal underneath the hob will hold
it securely in the cut-out. Any gap
between the frame and worktop will
reduce with time.
Connecting the mains connection
cable to the appliance
The mains connection cable must
only be connected by a suitably
qualified and competent person.
 Follow the instructions in the wiring
diagram (see "Electrical connection -
Wiring diagram").
Hob with frame or bevelled edge
Installing the hob
 Feed the mains connection cable
down through the cut-out.
 Place the hob centrally in the cut-out.
When doing this, make sure that the
seal under the hob sits flush with the
worktop on all sides. This is import-
ant to ensure an effective seal all
round.
Do not use sealant (e.g. silicone).
If the seal does not meet the worktop
correctly on the corners, the corner ra-
dius (≤ R4) can be carefully scribed to
suit.
 Connect the hob to the mains.
 Check that the hob works.
67

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Km 6839Km 6669Km 6679Km 6879Km 6699Km 6639

Table of Contents