Canon ae1 Installation Procedures Manual page 32

Hide thumbs Also See for ae1:
Table of Contents

Advertisement

Adjusting the Height
1) Loosen the two fixing screws [ l ] each on the front
and rear casters on the pickup side of the finisher.
2) To increase the height of the finisher and the punch-
er unit, turn the adjusting bolt [2] in the direction of
the arrow A (A full turn of the adjusting bolt will in-
crease the height of the finisher by 1.75
mm.).
Refer
to the index while turning the bolt, and perform this
for both front and rear casters.
3) To decrease the height of the finisher and the
puncher unit, turn the adjusting bolt [2] in the direc-
tion of the arrow B (A full turn of the adjusting bolt
will decrease the height of the finisher by 1.75
rnrn.). Refer to the index while turning the bolt, and
perform this for both front and rear casters.
Adjusting the Tilt
1) Loosen the two fixing screws [I] each on the front
and rear casters on the delivery side of the finisher.
2) To decrease the gap between the punch unit and the
host machine, turn the adjusting bolt
[2]
in the di-
rection of the arrow A (A 111 turn of the adjusting
bolt will increase the height of the finisher by 1.75
mm.). Refer to the index on the caster while turning
the bolt, and perform this for both front and rear
casters.
3) To increase the gap between the puncher unit and
the host machine,
t u r n
the adjusting bolt [2] in the
direction of the arrow B (A full turn of the adjusting
bolt will decrease the height of the finisher by 1.75
mm.). Refer to the index on the caster while turning
the bolt, and perform this for both front and rear
casters.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae2M2N1P1L1

Table of Contents