Basic Operations; Monitor/Operation; Screen Sequence - Mitsubishi Electric AE-200A Instruction Book

Air conditioning control system
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

3. Basic operations

3-1. Monitor/Operation

Unit groups can be monitored and operated on the AE-200/AE-50's LCD or the Integrated Centralized Control Web.
This section explains how to monitor and operate the unit groups.

3-1-1. Screen sequence

3-1-1-1. LCD
[Floor] display (zoomed-in)
Touch [Floor].
Touch [Block].
[Block] display
[Measurement] display
* The [Measurement] tab will appear only when an AI or PI controller is connected or when the AE-200 built-in PI controller is enabled.
For further information of operation methods for each function, refer to the Instruction Book (Detailed operations).
WT07982X03
Touch [
].
Touch [
].
Select a group and
touch [Operate].
Touch [OK] or
[Cancel].
Select a group and
touch [Operate].
Touch [OK] or [Cancel].
7
[Floor] display (zoomed-out)
Operation settings screen

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aAe-200eAe-50e

Table of Contents