Wall Mounting Template; Preparing The Wall; Fitting The Wall Mounting Plate; Mounting The Boiler - Zanussi ULTRA+ COMBI 30 Installation And Servicing

Hide thumbs Also See for ULTRA+ COMBI 30:
Table of Contents

Advertisement

2.5 WALL MOUNTING TEMPLATE

The wall mounting template is located on the internal protective
packaging. The template shows the position of the fixing and rear
flue centre holes for a standard installation
Care MUST be taken to ensure the correct holes are drilled.
1. Tape template into the required position, ensuring its squareness
by hanging a plumbline as shown.
2. If fitting a side flue, extend the flue centreline onto the side by
155mm on a standard wall fix or 200mm if using a stand-off
bracket.
3. Mark the following on to the wall:
a The selected group of wall mounting screw holes.
b. The centre position of the flue duct. Marking both the centre
and the circumference of the flue duct.
4. Remove the template plate from the wall.

2.6 PREPARING THE WALL

IMPORTANT.
Ensure that, during the cutting operation, masonry falling
outside of the building does not cause damage or personal
injury.
1. Cut the flue hole (preferably with a 5" core boring tool),
ensuring that the hole is square to the wall.
Both wall faces immediately around the cut hole should be
flat.
2. Drill 2 mounting holes (marked from template) with a 7.5mm
/ 8mm masonry drill and insert the plastic plugs, provided,
for the wall mounting plate.
3. Locate 2 No.14 x 50mm screws in the wall mounting plate
(one at each side, in any of the 3 holes provided at each
side) and screw home. Ensure mounting bracket is level.

2.7 FITTING THE WALL MOUNTING PLATE

Screw the wall mounting plate to the wall using 2 wall plugs
(previously fitted) with the 2 screws provided.
Choose one of the 2 sets of slots in left and right bank.
Ensure that at least one of the screws is fitted into a top slot
and the mounting bracket is level.
Example of fixing
esp9496
20
SECTION 2 - INSTALLATION
Extended centre line
Rear flue only
5" diameter hole
X
Section
through wall
Note. Check all of the hole
positions before drilling.

2.8 MOUNTING THE BOILER

1. Ensure the plastic plugs are removed from both the CH
and DHW connections before mounting the boiler.
Note. Boiler may contain residual water.
2. Lift the boiler onto the wall mounting plate (refer to the
Introduction section for safe handling advice), locating it
over the two tabs.
1 5 5
(2 0 0 )
A** - See Diagram in
Section 1.16
Side flue only
5" diameter hole
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra+ combi 35

Table of Contents