ABB 8232 Instruction Manual page 35

Ion-selective electrode monitor
Table of Contents

Advertisement

5
If required, fit new pump tube
bungs and shims, from the kit, to
the left hand side of the pump.
Note. The bungs are
designed to grip the pump
tube when compressed by
the platen. Two sizes of tube
are used so it is essential
that the correct size of bung
is fitted. The sample tube,
which is the larger of the two,
is fitted at the front of the
pump. It is important that the
shims are always fitted.
6
Pass new pump tubes, from the
kit, through the tube bungs and
case grommets. Connect to the
appropriate tube connector at the
rear of the case.
Apply downward force.
7
Locate the tubes centrally on the pump rollers.
Fig. 8.2 Peristaltic Pump
8 MAINTENANCE...
Remove the pump platen by applying
1
gentle downward force to the platen
while turning the catch mechanism
to the vertical position and pulling the
catch forward.
Lower the pump platen, only from
8
directly above, on to the pump tubes
until the catch mechanism locates in
the hole in the case, and turn the
catch lever to the horizontal position.
Disconnect each pump tube from its
2
respective tube connector at the rear
of the case, pull through the
grommets and discard.
3
Remove the retaining screw on the
pump shaft and remove the capstans.
4
Fit all three new capstans, from the
kit, on the hexagonal shaft so the
rollers are offset from one another.
Fit retaining screw.
33

Advertisement

Table of Contents
loading

Table of Contents