NOTE
1.
When installing the Clamper Magnet, install it with the
green face up.
2.
When installing the wire of the Lever Switch, install it
correctly as Fig. 4-4-B.
3.
When installing the Lever Switch, install it correctly as
Fig. 4-4-C.
4.
In case of the Lever Switch installation, hook the wire on
the Main Frame as shown Fig. 4-4-D.
Lever Switch
The Lever should be position
between A and B.
Rack Loading
4-5: TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 4-5-A)
1.
Remove the Traverse Holder.
2.
Remove the 2 Insulator (F).
Main Chassis Ass'y
Insulator (F)
(Black)
Traverse Holder
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 4-5-B.
1-4
DISASSEMBLY INSTRUCTIONS
Red
White
Blue
From DVD PCB
Fig. 4-4-B
A
B
Fig. 4-4-C
Lever Switch
Fig. 4-4-D
Insulator (F)
(Black)
Fig. 4-5-A
Main Chassis Ass'y
4-6: SWITCH PCB ASS'Y (Refer to Fig. 4-6-A)
Remove the screw 1.
1.
2.
Remove the Switch PCB Ass'y.
Switch PCB Ass'y
Main Chassis Ass'y
• Screw Torque: 4 ± 0.5kgf•cm
NOTE
1. When installing the wire of the Switch PCB, install it
correctly as Fig. 4-6-B.
Switch PCB Ass'y
4-7: RACK FEED ASS'Y (Refer to Fig. 4-7-A)
Remove the screw 1.
1.
2.
Remove the Rack Feed 1/2 Spring, Rack Feed 1/2 and
Rack Feed Lever.
Rack Feed 1 Spring
Rack Feed 2 Spring
Rack Feed Lever
Rack Feed 1
• Screw Torque: 3.5 ± 0.5kgf•cm
Traverse Holder
Fig. 4-5-B
1
Fig. 4-6-A
Black
From Relay PCB
White
Fig. 4-6-B
1
Rack Feed 2
Main Chassis Ass'y
Fig. 4-7-A