4.. Route.the.wire.cable.into.the.timer.through.the.
large.opening.in.the.base.of.the.housing.or.
through.PVC.conduit.(if.installed)..Strip.insulation.
back.3/8".(10mm).from.all.cable.wires.
.
Note:.The.zone.modules.have.quick-release.wire.
terminals..To.attach.wires,.simply.raise.the.lever,.
insert.the.stripped.wire,.and.press.the.lever.down.
to.secure.
5.. Secure.the.valve.common.wire.to.the.terminal.
labeled.COM..Connect.the.individual.zone.valve.
wires.to.the.appropriate.zone.module.terminals..
Connect.the.master.valve.wire.(if.applicable).to.
the.terminal.labeled.PUMP/MV..
Connecting a Pump Start Relay
Note:.Connecting.a.master.valve.or.pump.start.relay.
is.optional.and.may.not.be.required.for.your.sprinkler.
system.
CAUTION: To prevent timer damage, do not
connect the timer directly to the pump starter.
A 24 VAC, 0.3A (max) relay must be used.
1.. Route.wire.pair.from.the.24V.relay.into.the.timer..
2.. Connect.one.wire.to.the.terminal.labeled.COM..
Connect.the.remaining.wire.to.the.terminal.
labeled.PUMP/MV.
CAUTION: To prevent pump damage due to
back pressure, remove all unused zone modules.
Connect a jumper wire from an unused zone
terminal to a terminal with a valve connected.
Connecting the Plug-in Transformer
CAUTION:.Do not plug the transformer into an
electrical outlet until all of the wiring procedures
have been completed.
1.. Route.the.cable.from.the.transformer.through.the.
small.opening.in.the.base.of.the.housing.
2.. Connect.one.cable.wire.(in.either.order).to.each.
terminal.labeled.24.VAC.
.
Note:.The.display.will.begin.flashing.12:00.
Press.any.button.to.halt.flashing..
..