Installation - Siemens SITRANS Probe LU Quick Start Manual

Profibus pa
Hide thumbs Also See for SITRANS Probe LU:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Installation

WARNINGS:
Installation shall only be performed by qualified personnel and in accordance with
local governing regulations.
SITRANS Probe LU is to be used only in the manner outlined in this manual,
otherwise protection provided by the equipment may be impaired.
Note: Please refer to the device nameplate for approval information.
Mounting location
Recommendations
• Ambient temperature should be within –40 to +80 °C (–40 to +176 °F).
• Provide easy access for viewing the display and programming via the handheld
programmer.
• Provide an environment suitable to the housing rating and materials of construction.
• Keep the sound path perpendicular to the material surface.
Precautions
• Avoid proximity to high voltage or current wiring, high voltage or current contacts, and to
variable frequency motor speed controllers.
• Avoid interference to the sound path from obstructions or from the fill path.
The sound path should be:
perpendicular to the
monitored surface
clear of rough walls,
seams, rungs, or
other obstructions
clear of the fill path
s.
Page EN-4
SITRANS Probe LU (PROFIBUS PA) – QUICK START MANUAL
pipe
ladder
rung
seam
Fill
10°
7ML19985QV81

Advertisement

Table of Contents
loading

Table of Contents