Installation; Foundation/Base Plate/Skid; Leveling; Grout - Pioneer PT Series Operation & Maintenance Manual

Self-priming centrifugal pump
Table of Contents

Advertisement

INSTALLATION

WARNING!!!
Review safety information in safety information section. This section is intended to outline general
recommendations and practices required to position and arrange the pump and piping in static lift
situations. If installing the unit in flooded suction applications some of the information will need to
be tailored to the specific application. Never exceed the maximum permissible operating pressure
of the pump as shown on the pump performance curve.

FOUNDATION/BASE PLATE/SKID

If using a concrete foundation it should be rigid enough to inhibit vibration. Pour the foundation
well in advance of installation of pump equipment to allow time for drying and curing.
If the pump is to be mounted on a steel frame, or similar structure, it should be set directly over the
supporting beams. These beams and the structure must be rigid enough to prevent distortion and
potential misalignment due to movement within the structure or base.
The location of this structure should be as close as possible to the pumpage source. Provide
adequate space for operation, maintenance and inspection of the pump and equipment.
The concrete foundation should be provided with anchor bolts for attachment to the base plate. If
required, provide adequate drainage to keep pump and motor dry and clean. Also, provide either
leveling nuts or leveling wedges for mounting the base plate to the foundation.

LEVELING

When mounting the base plate to the foundation use the leveling nuts or wedges to provide a level,
flat base plate. Use a machinist's level on the mounting pads and make adjustments as necessary as
the anchor bolts are tightened. This will provide the true alignment between the pump and motor.

GROUT

If this base plate is to be grouted, ensure that you have the mounting surface flat and level for correct
alignment of pump and motor. Build a dam around the base plate perimeter that is to be watertight.
Use standard grouting practice and be sure to protect (cover) the leveling wedges with caulk or
plastic tape if they are to be removed later. After the grout has thoroughly hardened, remove forms.
If the wedges are removed, fill holes with grout. Seal grout by covering with a quality paint or
sealer.

TRAILER MOUNTED UNITS

See "OPERATION" section.
7