Operation; Priming The Pump; Pressure Switch Wiring; Wiring Chart - Craftsman 390.2521 Owner's Manual

Professional 1/2 hp shallow well water system
Table of Contents

Advertisement

ELECTRICAL
NOTICE:
Dual-voltage
motors
are factory
wired
for 230
volts.
If necessary,
reconnect
the motor
for 115 volts,
as
shown.
Do not alter the wiring
in single voltage
motors.
Install, ground,
wire,
and maintain
your pump
in compli-
ance
with
the
National
Electrical
Code
(NEC)
or
the
Canadian
Electrical
Code (CEC), as applicable,
and with
all
local codes
and ordinances
that
apply.
Consult
your local
building
inspector
for code information.
Motor wires connect here.
-Power supply wires connect here.
230 Volt: Connect 2 hot wires (black and red)
here and cap the white (neutral) wire. It does
not matter which wire goes to whichscrew.
115 Volt: Connect one hotwire (black or red)
to one of these screws (it doesn't matter
whichone). Connect the white (neutral) wire
to the other screw. Cap any remaining
black or red wires.
L;lampthe power cable to prevent strain
on the terminal screws.
- Connect the green (or bare copper) ground wire
to the green ground screw.
3187 0 398
Figure 6 - Pressure Switch Wiring
Connection
Procedure:
1.
2.
Connect
the ground
wire first as shown
in Figure 4. The
ground
wire must be a solid copper
v_tre at least as large
as the power
supply
w'tres.
There
must
be a solid
metal
connection
between
the
pressure
switch
and the motor
for motor grounding
pro-
tection,
ff the pressure
switch
is not connected
to the
motor,
connect
the green ground
screw in the switch
to
the green ground
screw tinder the motor end cover. Use
a solid copper
wire at least as large as the power
supply
wires.
3.
Connect
the ground wire to a grounded
lead in a service
panel,
to a metal
underground
water pipe,
to a metal
well casing
at least ten feet (3M) long, or to a ground
electrode
provided
by the power
company
or the hydro
authority.
4.
Connect
the power
supply
wires to the pressure
switch
as shown
in Figure 6.
Motor
Horsepower
1/2
Table II Wiring
Chart
- Recommended Wire and Fuse Sizes
Volts
115/230
Max. Load
Amps.
10.5/5.2
Branch
Fuse*
Rating Amps
15/15
Distance in Feet from Motor to Meter
0' to
101' to
201' to
301' to
401' to
100'
200'
300'
400'
500'
Wire Sizt
1_14
1_14
_14
_14
_12
OPERATION
Priming
the Pump
NOTICE:
To properly
prime
the pump,
install a pipe tee in
the discharge
piping
(see Figure
1, Page 4).
To prevent
damage
to internal
parts,
do not start motor until
pump
has been
filled with water.
To prime pump:
1.
Remove
priming
plug
(Purchase
separately;
Figure 1,
Page 4).
2.
Fill pump
with water.
3.
Replace
priming
plug, using
Teflon
tape
or Plasto-Jcdmt
stik 2 on plug threads;
tighten
plug.
4.
Start the pump.
Water should
be pumped
in 1-2 minutes.
ff not, repeat
steps
1, 2 and 3.
On shallow
depths
to water
(10 feet or less), the pump
will probably
prime
the first time
after the following
steps
1 through
4 above.
5,
From
10 to 20 foot depths,
you might
have to shut off
the pump
and repeat
steps
1, 2 and 3 several
times.
If, after
priming
pump
several
times,
no water
is
pumped,
check
the following:
A. Be sure suction
pipe is in the water.
B. Be sure suction
pipe does not leak.
C. Be sure that pump
is not trying to llft water
too high
(see "Piping
in the Well", Page 4).
D. As long as foot valve and check
valve function
cor-
rectly and suction
pipe does not develop
leaks, pump
should
not need repriming
in normal
service.
z Lake Chemical
Co., Chicago,
Illinois

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents