About This Document - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

RRU3249
Installation Guide
Purpose
This document describes the process of installing a DC blade RRU3249 (referred to as RRU in
this document).
Product Version
The following table lists the product version related to this document.
Product Name
DBS3900
Intended Audience
This document is intended for:
Base station installation engineers
Organization
1 Changes in the RRU3249 Installation Guide
This chapter describes the changes in the RRU3249 Installation Guide.
2 Installation Preparations
This chapter describes the reference documents, tools, and instruments that must be ready before
the installation. In addition, it specifies the skills and prerequisites that installation engineers
must have.
3 Information About the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
Issue DraftA (2015-05-30)
Solution Version
l SRAN8.0 and later
versions
l eRAN6.0 and later
versions
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.

About This Document

About This Document
Product Version
V100R008C00 and later
versions
ii

Advertisement

Table of Contents
loading

Table of Contents