Information About The Installation - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

RRU3249
Installation Guide
3
About This Chapter
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
3.1 RRU Exterior
This section describes the exterior and dimensions of an RRU.
3.2 RRU Ports
This section describes ports on the RRU panels. An RRU has a bottom panel, cabling cavity
panel, and indicator panel.
3.3 RRU Indicators
This section describes six indicators on an RRU. They indicate the running status of the RRU.
3.4 Installation Options
This section describes RRU installation options. RRU installation supports the centralized mode.
3.5 Installation Clearance Requirements of an RRU
This section describes the requirements for the installation clearance of multiple RRUs and the
requirements for the installation spacing between RRUs.
Issue DraftA (2015-05-30)

Information About the Installation

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Information About the Installation
6

Advertisement

Table of Contents
loading

Table of Contents