Information About The Installation; Ru Exterior - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

RRU3260
Installation Guide
3
About This Chapter
Before installing an RU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.

3.1 RU Exterior

This section describes the exterior and dimensions of an RU.
3.2 RU Ports
This section describes ports on the RU panels. An RU has a bottom panel, cabling cavity
panel, and indicator panel.
3.3 RU Indicators
This section describes six indicators on an RU. They indicate the running status.
3.4 Installation Scenarios
An RU can be installed on a pole, U-steel, angle steel, wall, or IFS06. Installation scenarios
must meet heat-dissipation and waterproofing requirements of the RU.
3.5 Installation Clearance Requirements of an RU
This section describes the requirements for the installation clearance of a single RU and
multiple RUs and the requirements for the installation spacing between RUs.
3.1 RU Exterior
This section describes the exterior and dimensions of an RU.
Figure 3-1
Issue 05 (2014-06-30)

Information About the Installation

shows an RU.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Information About the Installation
6

Advertisement

Table of Contents
loading

Table of Contents