Installation Guide
4 Unpacking the Equipment
This chapter describes how to unpack and check the delivered equipment to ensure that all the
materials are included and intact.
5 Installation Process
The installation process involves installing an RU and RU cables, checking the RU hardware
installation, and powering on the RU.
6 (Optional) Installing the Plastic Shells of the RU
This section describes the procedure for installing the plastic shells of the RU.
7 Hoisting an RU and Related Cables onto a Tower
This section describes the procedure for hoisting an RU and related cables onto a tower and
the precautions that must be taken.
8 Installing the RU
This chapter describes the procedure for installing the RU. The procedure for installing the
RU varies depending on installation options.
9 Installing RU Cables
This chapter describes the procedure for installing RU cables.
10 Checking the RU Hardware Installation
After an RU is installed, check the hardware installation.
11 Powering On an RU
After all the devices are installed, check the power-on status of an RU.
12 Appendix
This section describes the procedure for adding an easy power receptacle (pressfit type)
connector.
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Issue 05 (2014-06-30)
Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
About This Document
iii

Advertisement

Table of Contents
loading

Table of Contents