Beko BEKOMAT 33U Instructions For Installation And Operation Manual page 25

Condensate drain
Table of Contents

Advertisement

Pos: 70 / - - - - Sei t enum br uch - - - - @0\ m od_1157028099015_ 0. docx @ 2903 @ @ 1
BEKOMAT® 33U / 33U CO
Control and maintenance
Installation of the control unit on the BEKOMAT:
1. Check whether or not the service unit (9) goes
with the control unit (1) (model designation and
colour of the arresting hook).
2. Check whether or not the sealing mat (8) and
the contact springs (28) are clean, dry, and free
from impurities.
3. Introduce the sensor (5) into the service unit (9).
4. Hang the hook (29) of the control unit (1) in the
service unit (9).
5. Press the control unit (1) against the service
unit (9) and snap into place.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
• Leak test of the screwed connector of the con-
densate receiver tank and of the connection of
this tank to the service unit
• Check of the electrical connections
• Check of the correct engagement of the control
unit
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 33u co

Table of Contents