DLP-A441 Install Electrical Cables on the UBIC-H EIAs
Figure 21-1
If available, tie wrap or lace the cables according to Telcordia standards (GR-1275-CORE) or local site
Step 5
practice.
Note
Return to your originating procedure (NTP).
Step 6
Cisco ONS 15454 Procedure Guide, R5.0
21-22
Fully Cabled UBIC-H (A-Side)
When routing the electrical cables be sure to leave enough room in front of the alarm and
timing panel so that it is accessible for maintenance activity.
Chapter 21
DLPs A400 to A499
March 2005