Installation Instructions - GE UPK3 Installation Instructions Manual

Drain pump kit
Hide thumbs Also See for UPK3:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLING PUMP KIT
1
DISCONNECT ELECTRICAL
POWER
WARNING
Death or serious injury can result from failure to
follow these instructions.
• Service by a qualified service technician only.
• Disconnect power before servicing this product.
• Reconnect all grounding devices after service.
• Replace all parts and panels before operating.
2
REMOVE BACK PANEL
A. Remove all ice if applicable.
B. Drain reservoir by removing reservoir drain
cap. Replace cap when water has drained.
POWER
ON/OFF
Drain Cap - Nugget Model
Drain Cap - Gourmet Cube Model
2

Installation Instructions

Electrical Shock Hazard
CLEAN
ICE
CHECK
TIME TO
RESET
MAKING
WATER
CLEAN
2
REMOVE BACK PANEL (Cont.)
C. Remove the screws from the back panel
(19 for gourmet cube models; 15 for nugget
models).
UCC15
Gourmet
Cube
Model
Screw
Locations
D. Remove the side service panel. Pull out on
the left side (1) and back (2) to remove.
2
1
3
REMOVE FRONT PANELS
A. Open the ice machine door all the way.
B. Remove the Service Panel by first removing
the Circular Screw Cover and then the screw.
C. Remove the Kickplate by removing the 2
screws securing it to the base.
Service
Panel
Circular
Screw
Cover
(Gourmet Cube
Machine Shown)
UNC15
Nugget Model
Screw
Locations
Kickplate Screws
31-1000385 Rev. 0

Advertisement

Table of Contents
loading

Table of Contents