Prlk396A0 Wiring - LG PAHCMR000 Installation Manual

Hide thumbs Also See for PAHCMR000:
Table of Contents

Advertisement

Wiring Installation
1. Open the terminal box cover.
2. For PRLK396A0, run the field-supplied wiring (six [6] wired, 18AWG, stranded, shielded copper) to / from the AHU Communications Kit
through the cable connector on the EEV Kit.
3. Connect wiring to the terminal connections following the label and color codes pasted onto the bottom of the terminal box and shown
below. Securely tighten all connections.
4. Route the wiring through and out the EEV Kit as shown, and secure with the support tie (D).
5. Re-install the terminal box cover and secure the cover with the four (4) screws.
6. Taking care not to damage the field-supplied wiring or insulation, reattach the EEV Kit Top Panel by securing it with the screws at the four
(4) corners.
Figure 25: PRLK396A0 EEV Kit Wiring.
Field Wiring
BR : Brown
OR : Orange
RD : Red
YL : Yellow
BL : Blue
WH : White
Detail
D
Pipe Outlet 5/8
to AHU coil liquid
pipe connection
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
EEV KIT INSTALLATION
PRLK396A0 EEV Kit
(cover removed)
7-1/2
A
D
B
Mounting
Hole 1/4
Pipe Inlet 5/8
from ODU

PRLK396A0 Wiring

AHU controller
A. Terminal Box Cover
B. Cable Strain Relief Connector
C. Terminal Connector
D. Electrical Wiring (field supplied,
6 wires, 18 AWG, stranded,
shielded
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents