8 Installation with option +H358 UK gland plate
2. Prepare to make holes in the UK gland plate for the SWA glands of the cables to
be installed. Lay out the glands onto the gland plate so that the earthing rings
have space. Drill the needed holes. This drawing shows an example. The number
and layout of the holes varies in different frames.