Cable Box - ABB ACS580-01 Installation Manual

Uk gland plate +h358
Hide thumbs Also See for ACS580-01:
Table of Contents

Advertisement

6 Installation with option +H358 UK gland plate
Frames R6 to R9: Removing the standard bottom plate and
power cable clamp shelf from the cable box
Remove the bottom plate, side plates and the power cable clamp shelf as shown
below. Save the screws. Install the clamp shelf screws back to maintain the degree of
protection.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs880-01Ach580-01Acq580-01

Table of Contents