ABB i-bus EIB Product Manual page 35

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
After selecting a newly created group address, an additional option appears
on the right-hand side.
Fig. 34:
Parameter window: "General, Lock time program"
Options:
lock with 1 / unlock with 1
lock with 1 means
unlock with 1 means
This parameter selects whether the time switch program is locked or
unlocked with a "1".
"0"
unlock
"1"
lock
"0"
lock
"1"
unlock
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents