Panasonic CZ-64ESMC3 Installation Instructions Manual page 24

Hide thumbs Also See for CZ-64ESMC3:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Test Operation
 Group
2
Press ◄ ► to select the zone.
3
Select the group from group 1 to 64 to
operate.
▲ ▼→
4
Perform test operation.
Press
5
Finish the test operation.
According to the test operation ON/
OFF procedure, set OFF.
24
(EN)
.
(continued)
Displays
the
selected
group.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents