Acceptance Tests; V I Sual I Nspect I On - GE IAV51A Instructions Manual

Voltage relays
Hide thumbs Also See for IAV51A:
Table of Contents

Advertisement

seal - i n uni t pi cks up and sea l s i n .
l a tches up and rema i ns exposed unti l rel eased by press i ng a button beneath th e l ower- l eft corner of the
cover .
The case i s s u i tabl e for ei ther s urface or semi -fl ush panel mounti ng a nd an assortmen t of hardware i s
prov i ded for ei ther mounti ng .
one i s requ i red .
Two of th e cover s crews have provi s i on for a sea l i ng wi re .
The case has s tuds or screw connecti ons at both ends or at the bottom only for the ex terna l connec­
ti ons .
The el ec tri cal connecti ons between the rel ay uni ts and the case s tuds are made th rough spri ng­
bac ked contact fi ng ers mounted i n s ta ti onary mol ded i nner and oute r b l ocks between wh i ch nests a removabl e
connecti ng pl ug whi ch compl etes the ci rcu i ts .
the external connec ti ons , and the i nner bl ocks h ave the termi nal s for the i nternal connecti ons .
The rel ay mechani sm i s mou n ted i n a s teel framework cal l ed the crad l e and i s a compl ete uni t wi th al l
l eads bei ng termi na ted at the i nner b l ock .
and the bottom and by a g u i de pi n at the back of the cas e .
th e rel ay cannot be i nserted in the case ups i de down .
connec ti ons between the res pect i ve b l ocks of the c radl e a n d case , a l so l ocks the l a tch i n pl ace .
cove r , which is fas tened to the case by thumbscrews hol ds the connecti ng pl ug i n pl ace .
To draw out the crad l e from a s i ng l e ended case , the cover mus t fi rst be removed .
pl ug can be drawn out.
opened .
After the connecti ng pl ug has been removed , the l ower l a tch can be re l eased a nd the crad l e eas i l y
drawn out.
To repl ace the cradl e , the reverse order shou l d be fo l l owed .
RECE I V I NG
These rel ays , when not s h i pped as a part of a con trol panel , wi l l be s h i pped i n cartons desi gned to
protect them agai n s t damage .
damage s u s tai ned duri ng sh i pmen t .
at once wi th th e transportati on company and the nearest General E l ectr i c Sal es Offi ce shou l d be noti f i ed
promptl y .
HANDL I NG
Reasonab l e care shoul d be exerc i s ed i n unpacki ng the rel ay i n order that none of the parts are
damaged or th e adjustments d i s tu rbed .
STORAGE
If the re l ays are not to be i ns tal l ed i mmed i a tel y , they shou l d be s tored i n thei r ori gi na l cartons i n
a pl ace that i s free from moi s ture , dus t , and meta l l i c chi ps .
Immedi a te l y upon recei pt of the re l ay an I NS PE CT I ON AND ACCEPTANCE TEST shou l d be made to i ns ure tha t
n o damage has been sustai ned i n shi pment and that the rel ay cal i brations have n o t been d i s turbed .
I f no pi c kup va l ue for the l eft contact i s s peci fied on the requ i s ition for the rel ays wi th tap bl ocks ,
the re l ay i s s h i pped w i th the tap p l ug i n the fi fth tap .
tap correspond i ng to th i s val ue .
i s put i n the tap nearest the req ui red va l ue ( the l ower tap i s used i f the val ue i s hal f way between two taps )
and the spri nq i s adj us ted to obta i n the requi red pi ckup .

V I SUAL I NSPECT I ON

Check the namepl a te s tampi ng to i ns u re th at th e model number and rati ng of the rel ay agree wi th th e
requi s i ti on .
Remove the re l ay from i ts case and check th at there are no broken or cracked mo l ded parts or other
s i g ns of phys i cal damage and that a l l screws are ti g h t .
l ocati on ( s ) and tha t they are properly formed ( s ee Fi g . 9 ) .
When the seal - i n u n i t pi cks up , i t ra i s es a target i nto vi ew wh i ch
The c0ver a ttaches to the case and al so carri es the reset mecha n i sm when
The outer b l ocks , a ttached to the case , have the s tuds for
Th i s crad l e i s hel d fi rmly i n the case wi th a l a tch a t the top
I n so doi ng , th e tri p c i rcui t is fi rst opened , then the vol tage ci rcu i ts are
RECE I V I NG , HANDL I NG AND STORAGE
Immed i a tel y u pon rece i pt of the rel ay , an exami nati on shou l d be made for a ny
I f i nj u ry or rough h andl i ng i s evi den t , a damage cl ai m shou l d be fi l ed

ACCEPTANCE TESTS

I f a speci fi ed val ue does not co i nc i de wi th one of the taps
GtH-1214
The cases and crad l es are so cons truc ted that
The connecti ng pl ug , besi des mak i ng the el ectr i ca l
I f
p i ckup i s spec i fi e d , the t�p pl ug i s set i n the
Check that the sh orti ng bars are i n the proper
7
The
Then the connecti ng
the tap p l uq

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iav52cIav53bIav52aIav53cIav53dIav51d ... Show all

Table of Contents