Fujitsu PRIMERGY TX1320 M4 Operating Manual

Fujitsu PRIMERGY TX1320 M4 Operating Manual

Hide thumbs Also See for PRIMERGY TX1320 M4:
Table of Contents

Advertisement

Questo manuale d'istruzione è fornito da trovaprezzi.it. Scopri tutte le offerte per
TX1320 M4 (VFY:T1324SX090IT)
Handbuchtyp - English
FUJITSU Server PRIMERGY TX1320 M4
Operating Manual
October 2018
o cerca il tuo prodotto tra le
migliori offerte di Server
Fujitsu PRIMERGY

Advertisement

Table of Contents
loading

Summary of Contents for Fujitsu PRIMERGY TX1320 M4

  • Page 1 Questo manuale d’istruzione è fornito da trovaprezzi.it. Scopri tutte le offerte per Fujitsu PRIMERGY TX1320 M4 (VFY:T1324SX090IT) o cerca il tuo prodotto tra le migliori offerte di Server Handbuchtyp - English FUJITSU Server PRIMERGY TX1320 M4 Operating Manual October 2018...
  • Page 2 All hardware and software names used are trademarks of their respective manufacturers. – The contents of this manual may be revised without prior notice. – Fujitsu assumes no liability for damages to third party copyrights or other rights arising from the use of any information in this manual.
  • Page 3 Before reading this manual For your safety This manual contains important information for safely and correctly using this product. Carefully read the manual before using this product. Pay particular attention to the accompanying manual "Safety Notes and Regulations" and ensure that these safety notes are understood before using the product.
  • Page 4 Please consult the sales staff of Fujitsu if intending to use this product for high safety use. Measures against momentary voltage drop This product may be affected by a momentary voltage drop in the power supply caused by lightning.
  • Page 5 Please note that the usage and operation conditions differ depending on the type of HDD used. For more information on the usage and operation conditions of each available type of HDD, see the following internet address: http://jp.fujitsu.com/platform/server/primergy/harddisk/ Operating Manual TX1320 M4...
  • Page 6 Operating Manual TX1320 M4...
  • Page 7: Table Of Contents

    Content Introduction ......11 Notational conventions ....11 Before you start .
  • Page 8 Content Starting up ......55 Installation steps, overview ....56 Unpacking the server .
  • Page 9 Content Installing HDD/SSD modules ....79 6.3.1 Installing 2.5-inch HDD/SSD modules ....79 6.3.1.1 Removing a 2.5-inch HDD/SSD dummy module .
  • Page 10 Content Operating Manual TX1320 M4...
  • Page 11: Introduction

    This operating manual is intended for those responsible for installing the hardware and ensuring that the system runs smoothly. It contains all the information you need to put your PRIMERGY TX1320 M4 into operation. To understand the various expansion options, you will need to be familiar with the fields of hardware and data transmission and you will require a basic knowledge of the underlying operating system.
  • Page 12 Introduction Operating Manual TX1320 M4...
  • Page 13: Before You Start

    Documentation overview To get an overview on all documents on your server, see the following table. All documentation on PRIMERGY hardware and ServerView software is available online from the Fujitsu manuals server at: http://manuals.ts.fujitsu.com For Japan: http://www.fujitsu.com/jp/products/computing/servers/primergy/manual/ The complete PRIMERGY documentation set can also be downloaded as a DVD ISO image at: ftp://ftp.ts.fujitsu.com/images/serverview/manuals...
  • Page 14 Management (eLCM)" user guide Spare parts identification and information system (not valid for Japan), available for online use or download (Windows OS) at Illustrated Spares catalog http://manuals.ts.fujitsu.com/illustrated_sp ares or from the CSS component view of the ServerView Operations Manager Contains abbreviations and explanations,...
  • Page 15 Description "Returning used devices" Recycling and contact information, manual available online at http://ts.fujitsu.com/recycling, or as a printed copy "Service Desk" leaflet Not applicable in Japan and other countries " サポー ト &サービ ス " for Japan that have different regulations for recycling RAID documentation, available online at http://manuals.ts.fujitsu.com...
  • Page 16 Before you start Operating Manual TX1320 M4...
  • Page 17: Product Description

    Product description This section provides an overview of the server and information on the features of the PRIMERGY TX1320 M4 server. The PRIMERGY TX1320 M4 server can be used in a horizontal or a vertical position. Overview of the server Figure 1: Server front - 2.5-inch variant...
  • Page 18 Product description Figure 2: Server front - 3.5-inch variant Pos. Component 2x 3.5-inch HDDs SATA ID card slot Accessible drives Front panel module Locking lever Operating Manual TX1320 M4...
  • Page 19: Features

    – Memory modules – System fans – Expansion cards For more information on replacing these components, see the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual". CSS indicators on the front panel and I/O panel of the PRIMERGY server provide you with information if a CSS event arises.
  • Page 20 Product description System board The features of the system board are described in the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual". The setup possibilities are described in the "D3673 BIOS Setup Utility for FUJITSU Server PRIMERGY TX1320 M4 Reference Manual".
  • Page 21 PSU can be replaced during operation (hot-plug). – One hot-plug PSU and one FJBU Fujitsu battery unit (FJBU) FJBU behaves as a modular UPS in the server. When power fail happened, the server can operate by FJBU for a while. FJBU supports hot-plugging, and can be replaced during operation.
  • Page 22 "hides" the defective system components. The Prefailure Detection and Analysis (PDA) technology from Fujitsu analyzes and monitors all components that are critical for system reliability. A RAID controller supports different RAID levels and increase the availability and data security of the system.
  • Page 23 ServerView Suite - Out-Of-Band Management). Server management Server management is implemented using the ServerView Operations Manager supplied and the PDA technology from Fujitsu. PDA reports the threat of a system error or overload at an early stage, allowing preventive measures to be taken.
  • Page 24 (memory module, CPU, fan or expansion card) is not functioning properly. The Flash EPROM program supplied with the Fujitsu utilities supports a fast BIOS update. With the iRMC on the system board, the server can also be maintained and serviced remotely.
  • Page 25 By combining these options, you can also achieve optimum protection for your system. A detailed description of the Security menu and how to assign passwords can be found in the "D3673 BIOS Setup Utility for FUJITSU Server PRIMERGY TX1320 M4 Reference Manual". Operating Manual...
  • Page 26: Connectors, Controls And Indicators

    Product description Connectors, controls and indicators 3.3.1 Connectors on the server 3.3.1.1 Server front Figure 3: Connectors on the server front 2 x USB 3.1 Gen 1 connectors Operating Manual TX1320 M4...
  • Page 27: Server Rear

    Product description 3.3.1.2 Server rear Figure 4: Connectors on the I/O panel Management LAN connector for 4x USB 2.0 connectors iRMC server management function Shared LAN connector (LAN1) Video connector (VGA) Standard LAN connector (LAN2) Serial connector COM1* 2x USB 3.1 Gen 2 connectors The serial connector can be used as the standard interface or for communication with iRMC.
  • Page 28: Controls And Indicators On The Server Front

    Product description 3.3.2 Controls and indicators on the server front 3.3.2.1 Controls on the front panel Figure 5: Controls on the front panel module Pos. Label Button Function Reboots the system. Press the reset button with a straightened end of a paper clip. RESET Reset button CAUTION!
  • Page 29: Indicators On The Front Panel

    Product description Pos. Label Button Function Used to switch the server on or off. If the system is running an ACPI- On/Off compliant operating system, pressing button the On/Off button will perform a graceful shutdown. 3.3.2.2 Indicators on the front panel Figure 6: Indicators on the front panel Pos.
  • Page 30 Product description Pos. Label Indicator Status Description No critical event detected (CSS component). Prefailure event detected (CSS component). orange [CSS] For HDDs/SSDs, see also indicator "HDD/SSD prefailure detection" on page flashing CSS component failure detected. orange No critical event detected (non CSS component).
  • Page 31 Product description Pos. Label Indicator Status Description – The server is switched off and connected to the mains (standby mode). – The server has been switched on but Power Cycle Delay settings delay it from turning on for a green on specified time.
  • Page 32 For more information on the flashing blue flashing orange emergency flash of the iRMC firmware, see the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual". HDD/SSD prefailure detection Depending on your hardware configuration HDD/SSD prefailure detection will be supported.
  • Page 33: Indicator On The Odd

    Product description 3.3.2.3 Indicator on the ODD ODDs may have an indicator or not. Figure 7: Example: Indicator on the ODD Pos. Indicator Status Description The ODD is inactive. Activity indicator green on The storage medium is being accessed. Operating Manual TX1320 M4...
  • Page 34: Indicators On The Hot-Plug Hdd Module

    Product description 3.3.2.4 Indicators on the hot-plug HDD module Figure 8: Indicators on the hot-plug HDD/SSD module Pos. Label Indicator Status Description The HDD/SSD is inactive. Access indicator green on The HDD/SSD being accessed No HDD/SSD error detected. An HDD/SSD error has been detected.
  • Page 35: Indicators On The Server Rear

    Product description 3.3.3 Indicators on the server rear 3.3.3.1 Indicators on the I/O panel ID, CSS and Global Error indicators Figure 9: ID, CSS and Global Error indicators Pos. Label Indicator Status Description The server has been highlighted using ServerView Operations indicator, blue on Manager, iRMC web interface or...
  • Page 36 An emergency flash of the iRMC firmware is in progress. For more information on the flashing blue flashing orange emergency flash of the iRMC firmware, see the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual". Operating Manual TX1320 M4...
  • Page 37 Product description LAN indicators Figure 10: LAN indicators Pos. Indicator Status Description A LAN connection has been green on established. link/transfer LAN is not connected. indicator flashing LAN data transfer is in progress. green yellow on Data traffic at a transfer rate of 1 Gbit/s. Data traffic at a transfer rate of LAN speed green on...
  • Page 38: Indicator On Hot-Plug Psu

    Product description 3.3.3.2 Indicator on hot-plug PSU Figure 11: Indicator on hot-plug PSU Pos. Indicator Status Description flashing The server is switched off, but mains green voltage is present (standby mode). The server is switched on and operating green on properly.
  • Page 39: Indicator On Fjbu

    Product description 3.3.3.3 Indicator on FJBU Figure 12: Indicator on FJBU Pos. Indicator Status Description flashing The battery unit is charging. green flashing green The battery unit is discharging. slowly FJBU status green on The battery unit is fully charged. indicator A battery unit failure has been detected.
  • Page 40 Product description Operating Manual TX1320 M4...
  • Page 41: Important Information

    Important information In this chapter you will find essential information regarding safety when working on your server. Depending on your server or the installed options some information is not valid for your server. CAUTION! Before installing and starting up a server, please observe the safety instructions listed in the following section.
  • Page 42 Important information Before starting up During installation and before operating the server, observe the instructions ● on environmental conditions for your server. If the server is brought in from a cold environment, condensation may form ● both inside and on the outside of the server. Wait until the server has acclimatized to room temperature and is absolutely dry before starting it up.
  • Page 43 Important information Always connect the server and the attached peripheral devices to the same ● power circuit. Otherwise you run the risk of losing data if, for example, the server is still running but a peripheral device (e.g. memory subsystem) fails during a power outage.
  • Page 44 Important information The warranty is void if the server is damaged during installation or ● replacement of server expansions. Only set screen resolutions and refresh rates that are specified in the ● operating manual for the monitor. Otherwise, you may damage your monitor. If you are in any doubt, contact your sales outlet or customer service center.
  • Page 45 Important information The battery used in this server may present a fire or chemical burn hazard if ● mistreated. Do not disassemble, heat about 100 °C (212F), or incinerate the battery. Replace the lithium battery on the system board in accordance with the ●...
  • Page 46 Important information Do not pull on, press hard, or otherwise handle the CD/DVD/BD tray ● roughly. Do not disassemble the ODD. ● Before use, clean the ODD tray using a soft, dry cloth. ● As a precaution, remove disks from the ODD when the drive is not to ●...
  • Page 47 Important information – Protect the disks from exposure to heat and direct sunlight. Laser information The ODD complies with IEC 60825-1 laser class 1. CAUTION! The ODD contains a light-emitting diode (LED), which under certain circumstances produces a laser beam stronger than laser class 1. Looking directly at this beam is dangerous.
  • Page 48 Important information Do not touch any connectors or conduction paths on an ESD module. ● Place all the components on a pad which is free of electrostatic charge. ● For a detailed description of how to handle ESD modules, see the relevant European or international standards (EN 61340-5-1, ANSI/ESD S20.20).
  • Page 49: Energy Star

    Important information If the server/rack is intended for permanent connection to the mains ● only an authorized specialist (electrician) is allowed to work. Please follow the regulation of each country. If the server is integrated into an installation that draws power from an ●...
  • Page 50: Ce Conformity

    Important information CE conformity The system complies with the requirements of European Regulations. Find the CE declaration on certificate portal: https://sp.ts.fujitsu.com/sites/certificates/default.aspx To open the CE declaration applicable for your system, proceed as follows: Ê Select Industry Standard Servers. Ê Select your model, e.g. Rack server.
  • Page 51: Fcc Class A Compliance Statement

    Consult the dealer or an experienced radio/TV technician for help. ● Fujitsu is not responsible for any radio or television interference caused by unauthorized modifications of this equipment or the substitution or attachment of connecting cables and equipment other than those specified by Fujitsu. The correction of interferences caused by such unauthorized modification, substitution or attachment will be the responsibility of the user.
  • Page 52: Environmental Protection

    Important information Environmental protection Environmentally-friendly product design and development This product has been designed in accordance with the Fujitsu standard for "environmentally friendly product design and development". This means that key factors such as durability, selection and labeling of materials, emissions, packaging, ease of dismantling and recycling have been taken into account.
  • Page 53 More information can be found at: http://ts.fujitsu.com/recycling Details regarding the return and recycling of devices and consumables within Europe can also be found in the "Returning used devices" manual, via your local Fujitsu branch, or at: http://ts.fujitsu.com/recycling Operating Manual TX1320 M4...
  • Page 54 Important information Operating Manual TX1320 M4...
  • Page 55: Starting Up

    Starting up CAUTION! Follow the safety instructions in chapter "Important information" on ● page Do not expose the server to extreme environmental conditions (see ● "Ambient conditions" on page 97). Protect the server from dust, humidity and heat. Ensure that the server is acclimatized for the time indicated in this ●...
  • Page 56: Installation Steps, Overview

    Starting up Installation steps, overview Ê First of all, carefully read the safety instructions in "Important information" on page 41 and following. Ê Transport the server to the place where you want to set it up. Ê Unpack the system, check the contents of the package for visible transport damage and check whether the items delivered correspond to the details on the delivery note, see "Unpacking the server"...
  • Page 57 Installation Manager" on page For more information on installing the server (remote or local), see the "ServerView Installation Manager" User Guide at http://manuals.ts.fujitsu.com under x86 Servers - Software - ServerView Suite - ServerView Suite Sitemap - Server Installation and Deployment.
  • Page 58: Unpacking The Server

    Ê Remove all scratching protection foils from the front panel, HDD/SSD frames, Fujitsu and PRIMERGY logo, VGA dummy and ODD dummy in case they are still sticked to the server system. Operating Manual...
  • Page 59: Setting Up The Floorstand Model

    Starting up Setting up the floorstand model if you are using a PRIMERGY TX1320 M4 server horizontally, skip this section and continue reading ar section "Positioning the server horizontally" on page CAUTION! Note the safety instructions in chapter "Important information" on page Ê...
  • Page 60 Starting up Figure 14: Clipping the stabilizers Ê Clip the stabilizers together in the direction of the arrow as far as the marking line (1). Figure 15: Adjusting the stabilizers Ê If applicable, adjust the width of the stabilizers: Ê Press the two locking levers (1) and keep them pressed. Ê...
  • Page 61 Starting up Figure 16: Placing the server on stabilizers Ê Place the server on the stabilizers (1). Ê Position the stabilizers between the rubber feet (see circles). Do not cover the ventilation grids Ê Press the stabilizers together (2). Operating Manual TX1320 M4...
  • Page 62: Positioning The Server Horizontally

    Starting up Positioning the server horizontally Figure 17: Positioning the server horizontally Ê Pull the stabilizers apart (2). Ê Remove the server from the stabilizers (1). CAUTION! If the server is positioned horizontally, ensure that the rubber feet are pointing downward. Ê...
  • Page 63: Connecting Cables

    Starting up Connecting cables 5.5.1 Notes on connecting/disconnecting cables CAUTION! Always read the documentation supplied with the device you wish to connect. Never connect, or disconnect cables during a thunderstorm. Never pull on a cable when disconnecting it. Always take hold of the cable by the plug.
  • Page 64: Connecting Devices To The Server

    Starting up Information for ensuring electromagnetic compatibility All data and signal cables must have sufficient shielding. The use of cable type S/FTP Cat5 or higher is recommended. Use of unshielded or badly shielded cables may lead to increased emission of interference and/or reduced fault-tolerance of the device.
  • Page 65: Connecting The Power Cord

    Starting up 5.5.3 Connecting the power cord In its basic configuration the server has a permanently installed PSU or a hot- plug PSU. Besides the hot-plug PSU, a second hot-plug PSU can be installed optionally to serve as a redundant power supply. If one PSU fails, the second PSU in the redundant configuration ensures operation can continue uninterrupted.
  • Page 66 Starting up Figure 18: Securing power cord Ê Thread the cable tie through the eye (1). Ê Pull the cable tie tight to secure the power cable (2). The insulated connector cannot now be disconnected from the server accidentally. You can loosen the cable tie by opening the small locking lever (2). Operating Manual TX1320 M4...
  • Page 67: Using The Cable Clamp

    Starting up 5.5.3.2 Using the cable clamp You can secure the power cord with a cable clamp to ensure that the power cord cannot be disconnected from the server by mistake. The cable clamp is included in the accessories pack that is delivered together with the server. Figure 19: Using cable clamps Ê...
  • Page 68: Switching The Server On For The First Time

    "Ambient conditions" on page 97. When operating the server out of the specified temperature range, the server may operate improperly and data loss may occur. Furthermore, Fujitsu cannot be held responsible for any related damage, malfunction, or loss of data, etc.
  • Page 69: Configuring The Server With Serverview Installation Manager

    When using the ServerView Installation Manager you can configure the onboard controller either before or during installation. Descriptions of operating systems not covered in the RAID controller manual are provided in the corresponding readme files under: http://www.fujitsu.com/global/services/computing/server/ia/driver/index. html For Japan: http://www.fujitsu.com/jp/products/computing/servers/primergy/downloa...
  • Page 70: Configuring The Controllers

    5.7.1.2 Installing the operating system For more information on installing the server, see the "ServerView Installation Manager" user guide at http://manuals.ts.fujitsu.com under x86 Servers - Software - ServerView Suite - Server Installation and Deployment. Ê Open this manual. Ê For the remote or local installation, follow the instruction in this manual and on the screen.
  • Page 71: Notes On Configuring Controllers

    A separate utility is available to the controller for MegaRAID configuration. For more information, see the "SAS Software User’s Guide" (on the Fujitsu manuals server under x86 Servers - Expansion Cards - Storage Adapters - LSI Configuration Software). More information on modular RAID controllers is provided in the "Modular RAID Controller Installation Guide"...
  • Page 72: Note On Operating System

    Open the Windows operating system / Restoring the preinstalled environment For the procedure to open the Windows operation system or to restore the preinstalled environment, see the manuals on the Fujitsu manual download site (http://www.fujitsu.com/jp/products/computing/servers/primergy/manual/) or the attached manuals. Linux operating system support...
  • Page 73: Operation

    "Ambient conditions" on page 97. When operating the server out of the specified temperature range, the server may operate improperly and data loss may occur. Furthermore, Fujitsu cannot be held responsible for any related damage, malfunction, or loss of data, etc.
  • Page 74 Operation Ê Press the On/Off button. The server is switched on, performs a system test and boots the operating system. In the case of configurations with a large memory size, the boot process may be prolonged and the screen may remain dark for several minutes.
  • Page 75 Operation The system can be switched off (hard power off) by keeping the On/Off button (approximately 4 - 5 seconds). CAUTION! There is a risk that data may be lost. – iRMC iRMC offers various options for switching the server on and off, e.g. via the System power button on the Global icons of the iRMC web interface.
  • Page 76: Access To The Drives

    Operation Access to the drives 6.2.1 Removing the drive cover Figure 20: Removing the drive cover Ê Turn the key counterclockwise (1) to unlock the drive cover and remove the key. Depending on the setting of the green hook in the drive cover, you can open the drive cover without turning the key or only with turning the key.
  • Page 77 Operation Figure 21: Placing the drive cover in front of the HDD cover Ê Place the drive cover on the HDD cover (1). Ê Push the drive cover in the direction of the arrow. When operating with tape drives: If the system is programmed to eject the media automatically, the accessible drives must not be obstructed.
  • Page 78: Removing The Hdd Cover

    Operation 6.2.2 Removing the HDD cover Figure 22: Removing the HDD cover Ê Turn the key counterclockwise (1) to unlock the drive cover and remove the key. Ê Open the HDD cover in the direction of the arrow and remove it (2). The HDD/SSD cover is replaced and the server locked in the reverse order.
  • Page 79: Installing Hdd/Ssd Modules

    Operation Installing HDD/SSD modules 6.3.1 Installing 2.5-inch HDD/SSD modules 6.3.1.1 Removing a 2.5-inch HDD/SSD dummy module Figure 23: Removing a 2.5-inch HDD/SSD dummy module Ê Press both tabs together (1) and pull the dummy module out of its bay (2). CAUTION! Keep the dummy module for future use.
  • Page 80: Installing A 2.5-Inch Hdd/Ssd Module

    Operation 6.3.1.2 Installing a 2.5-inch HDD/SSD module Figure 24: Opening the 2.5-inch HDD/SSD module locking lever Ê Pinch the green locking clip (1) and open the locking lever (2). Figure 25: Installing the 2.5-inch HDD/SSD module Ê Insert the HDD/SSD module into a drive bay and carefully push back as far as it will go (1).
  • Page 81: Installing 3.5-Inch Hdd Modules

    Operation 6.3.2 Installing 3.5-inch HDD modules The 3.5-inch HDD modules are non-hot-plug SAS/SATA HDDs. For more information, see the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual". Installing a second PSU 6.4.1 Removing the dummy cover Figure 26: Removing the dummy cover Ê...
  • Page 82: Installing A Psu

    Operation 6.4.2 Installing a PSU Figure 27: Folding up the handle Ê Push the handle of the PSU halfway upward in the direction of the arrow. Figure 28: Installing the PSU Ê Push the PSU into its bay (1) as far as it will go until the release latch snaps in place.
  • Page 83: Cleaning The Server

    Operation Figure 29: Installing the cable clamp Ê Push the cable clamp into the corresponding hole until it clicks in. Ê If applicable, configure the redundant power supply. Cleaning the server CAUTION! Switch off the server and disconnect the power plugs from the properly grounded power outlets.
  • Page 84 Operation Operating Manual TX1320 M4...
  • Page 85: Troubleshooting And Tips

    Ê Contact our customer service team. The meaning of the error message is explained in the documentation for the relevant components and programs, available online at http://manuals.ts.fujitsu.com. Power-on indicator remains unlit after you have switched on your device Cause Troubleshooting Power cable Ê...
  • Page 86 Troubleshooting and tips The system will not boot after installing a new HDD Cause Troubleshooting SAS configuration Ê Check the settings for the HDDs (SAS Device incorrect Configuration) and the additional settings in the SAS configuration menu. Screen remains blank Cause Troubleshooting Monitor is switched off Ê...
  • Page 87 Troubleshooting and tips Server switches itself off Cause Troubleshooting Server Management Ê Check the error list of System Event Log in has detected an error ServerView Operations Manager or in the iRMC web interface, and attempt to eliminate the error. No mouse pointer displayed on screen Cause Troubleshooting...
  • Page 88 Ê If the date and time are still wrong after the server discharged has been switched off and back on again, replace the lithium battery (see the "FUJITSU Server PRIMERGY TX1320 M4 Upgrade and Maintenance Manual") or contact our customer service team.
  • Page 89 Ê Remove and reinstall the drive while the system is switched on. If the HDD/SSD continues to be shown as defective, then replace it (see the "FUJITSU Server PRIMERGY TX1320 M4 Server Upgrade and Maintenance Manual"). Operating Manual TX1320 M4...
  • Page 90 RAID controller configuration program. For more information, see the "Integrated RAID for SAS User’s Guide" available online http://manuals.ts.fujitsu.com under x86 Servers - Expansion Cards - Storage Adapters - LSI SAS / SCSI RAID Contollers or in the "Modular RAID Controller Installation Guide"...
  • Page 91 Troubleshooting and tips ODD cannot read data Cause Troubleshooting ODD cannot read data Ê Check to see whether the CD/DVD/BD is inserted properly. If the CD/DVD/BD is not inserted, correctly insert the disk so that the label is facing Ê Check to see whether the CD/DVD/BD is not dirty. If the CD/DVD/BD is dirty, wipe it in a radial way with a soft, dry cloth.
  • Page 92 Troubleshooting and tips Operating Manual TX1320 M4...
  • Page 93: Technical Data

    Please be forewarned. The data sheets for this server contain more technical data. The data sheets are available online at: http://www.fujitsu.com/fts/products/computing/servers/primergy For more information, see the Documents tab under e.g. Rack Servers. For Japan: http://www.fujitsu.com/jp/products/computing/servers/primergy...
  • Page 94 Technical data Interfaces Rear: 4 x USB 2.0, 2x USB 3.1 Gen 2 Front: 2x USB 3.1 Gen 1 Internal: 2x USB 3.1 Gen 1 Graphics (15-pin) 1 x VGA Serial 1 (9-pin) 1 x serial RS-232-C, usable for iRMC or system or shared ®...
  • Page 95 Technical data Controllers RAID controller PSAS CP400i with "Integrated RAID" (IR) RAID levels 0 and 1 are supported for internal HDD configurations. Modular RAID controller (based on LSI SAS3108) SAS/SATA HDD/SSD up to 12 Gbit/s SAS, 6 Gbit/s SATA, 8 ports internal/external RAID level: 0, 1, 1E, 10, 5, 50, 6, 60 1/2/4 GB cache, optional FBU Modular RAID controller (based on LSI SAS3508)
  • Page 96 Technical data Slots - standard Slot 1: PCIe Gen3 x1 up to 167,65 mm length, low profile (mechanical x4) Slot 2: PCIe Gen3 x4 notched, up to 167,65 mm length, low profile (mechanical x4) Slots 3, 4: PCIe Gen3 notched, up to 167,65 mm length, low profile x8 (mechanical x8) Slot notes In SAS configuration 1x PCI-Express occupied by...
  • Page 97 Technical data Ambient conditions Environment class 3K2 EN 60721 / IEC 721 Part 3-3 Environment class 2K2 EN 60721 / IEC 721 Part 3-2 Ambient temperature 10°C - 35°C (DIN IEC 721-3-3) class 3K2, ETSI 300 019-2-3 Class 3.1 Temperature: Operation (3K2) 10°C ...
  • Page 98 100 - 240 V Rated frequency range 50 - 60 Hz Max. rated current 3.0 A - 1.5 A Electrical data: Fujitsu battery unit (FJBU) Max. output 380 W Backup duration Max. 2 seconds (380W), 4 minutes (280W) with FJBU M2...
  • Page 99 Technical data Compliance with standards Product safety and ergonomics International IEC 60950-1 2nd Edition am1 + am2 IEC 62368-1:2014 (Second Edition) Europe Safety EN 60950-1 2nd Edition EN 62368-1:2014 EN 62479 Ergonomics ISO 9241-3xx EN 2941-3xx EK1-ITB2000:2018 USA / Canada CSA-C22.2 No.
  • Page 100 Technical data Korea KN 32 / KN 35 CE marking to EU directives Low Voltage Directive 2014/35/EU Electromagnetic Compatibility 2004/30/EU RoHS Compliance Europe EN 50581 Taiwan CNS 15663 CAUTION! This device meets the requirements of Class A CISPR 22/32. This device can cause radio interference in residential areas.
  • Page 101: Warranty And Service

    Warranty and service Warranty The warranty regulations can be found online at: http://manuals.ts.fujitsu.com under x86 Servers - Safety / Eco / Warranty For Japan: http://www.fujitsu.com/jp/products/computing/servers/primergy/support/ For the warranty regulations select " 製品保証ご案内 ( 無償修理期間 )" Service Telephone numbers of the local service partner can be found online at: http://ts.fujitsu.com/support/servicedesk.html...
  • Page 102 Warranty and service Operating Manual TX1320 M4...

Table of Contents