Huawei ECC500 User Manual page 38

Hide thumbs Also See for ECC500:
Table of Contents

Advertisement

ECC500
User Manual
Context
Procedure
Step 1 Use a floating nut mounting bar to install floating nuts (one on each site) into the mounting
holes in the posts of the rack, as shown in
Figure 4-5 Installing floating nuts
Step 2 Install long mounting ears on the Independent Deployment AI/DI Unit.
Step 3 Secure the Independent Deployment AI/DI Unit in the cabinet by tightening the M6 screws
clockwise on the right and left mounting ears, as shown in
Figure 4-6 Installing a rack-mounted Independent Deployment AI/DI Unit
----End
Issue 04 (2019-12-20)
The following tools are available: Phillips screwdriver, flat-head screwdriver, and rubber
mallet.
When installing a rack-mounted Independent Deployment AI/DI Unit, choose
appropriate long mounting ears delivered with the Independent Deployment AI/DI Unit.
A flat-head screwdriver can be used as a floating nut mounting bar.
Ensure that the floating nuts on both sides are on the same horizontal line.
Copyright © Huawei Technologies Co., Ltd.
4 Installation and Commissioning
Figure
4-5.
Figure
4-6.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents