Huawei ECC500 User Manual page 85

Hide thumbs Also See for ECC500:
Table of Contents

Advertisement

ECC500
User Manual
Step 3 Set AI/DI_1 Upper DI Alarm Association to the DO port to be associated, and then click
Submit.
Figure 7-12 Linking an AI/DI alarm to a DO port (new page)
Figure 7-13 Linking an AI/DI alarm to a DO port (old page)
Step 4 Choose Monitoring > MUE05A Expansion Card > MUE05A4 > Running Parameter >
DO Control.
Step 5 Click DO Settings, select Association, and click Submit.
Issue 04 (2019-12-20)
SLOT1_DO (new page) or DO1 (old page) represents that the MUE05A expansion card where the
DO port is located is installed in slot 1 of the ECC500.
DO_1 represents the DO_1 port on the GPRS expansion card.
FAN1 represents fan 1 connecting to the ECC500.
Copyright © Huawei Technologies Co., Ltd.
7 FAQ
78

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents