Installation and commissioning flowchart

Identify the frame size of your drive: R1 or R3.
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and required
cooling air flow.
Unpack and check the drive.
If the drive will be connected to an IT (ungrounded) or
corner grounded system, check that the internal EMC
filter is not connected.
Install the drive on a wall or in a cabinet.
Remove the dust protection sticker.
Install the IP66 glands and route the cables.
Check the insulation of the input cable, the motor and
the motor cable.
Connect the power cables.
Connect the control cables.
Check the installation and the gaskets.
Commission the drive.
Task
See
Technical
data:
Ratings
on page
Planning electrical installation in the ACS350
User's Manual.
Technical data
on page
38
Mechanical
installation:
Unpacking the drive
page
21
Hardware
description:
Type code
Electrical
installation:
Connecting the power
cables
on page
28
Mechanical installation
on page
Planning electrical installation: Routing the
cables in the ACS350 User's Manual
Electrical installation: Checking the insulation of
the assembly in the ACS350 User's Manual.
Electrical
installation:
Connecting the power
cables
on page
28
Electrical installation: Connecting the control
cables in the ACS350 User's Manual.
Installation checklist
on page
Start-up, control with I/O and ID Run in the
ACS350 User's Manual.
15
38
on
on page
19
21
31
About the manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs350 series

Table of Contents