Installation Of This Product - NEC N8103-136 User Manual

Additional battery
Table of Contents

Advertisement

23

1-2. Installation of this product

1-2-1. Connection of a connection board and a RAID
controller
See the following instructions and figures.
1.
A connection board of this product is installed in the RAID controller by 3 screws.
RAID Controller (Screws x 3pcs)

Advertisement

Table of Contents
loading

Table of Contents