GE Monogram ZWVS1000SR Installation Instructions Manual page 16

Wine vault
Hide thumbs Also See for Monogram ZWVS1000SR:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
PREPARE CEILING PANELS FOR INSTALLATION
Install the Junction Box in the
Front Ceiling Panel
Step 1:
Center the junction box on the front
hole on top of the front ceiling
panel. Using the junction box as a
template, draw a line outlining the
shape of the box.
Step 2:
Use a scroll saw with a sheet metal
blade to cut the stainless steel
rectangle out of the panel.
Clean out the foam insulation
enough to allow the box to fit flush
into the ceiling panel.
Step 3:
Drill a 7/8" dia. hole in a blank
junction box cover plate. Install a
strain relief.
Remove approximately 6" of the
outer jacket of the power cord.
Strip each wire end.
Insert the power cord through the
strain relief and tighten the strain
relief screws to hold the power
cord securely.
Step 4:
Remove 5 star grommets from the
inside (white painted side) of the
center ceiling panel.
16
Front ceiling
panel
Junction box
location
Power
cord
Strain relief
Junction box
cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zwvt1000sr

Table of Contents