For the IPC 40.2 an external battery pack for cabinet mounting is
available.
IPC 40.2
X19
Fig. 8-3:
External battery pack
To connect the external batteries proceed as follows:
1. Fix the battery pack in the control cabinet.
2. Switch off the supply voltage for the IPC 40.2. If required, unplug all
connectors from the IPC 40.2.
3. Connect the 2-pin battery cable to connection X19 of the IPC 40.2.
The original cable is reverse voltage protected.
Fig. 8-4:
Position and pin assignment of the battery connection
Ensure that the polarity of the batteries is correct.
In the case of a polarity reversal of the batteries a
F10A (5x20) fuse is released on the power supply
unit.
DANGER
Note:
If the new battery pack is not yet charged, during the charging
time there's no sufficient USP protection enabling a controlled
shutdown of the PC. Therefore, use completely charged
batteries, if possible. The charging time of a 2.5Ah battery is
approximately 5 hours.
4. Switch on the supply voltage for the IPC 40.2 again.
5. Observe the "UPS" LED on the front panel:
• UPS LED OFF:
• UPS LED flashes red:
Wait approximately 5 hours until the batteries are charged and the
UPS LED extinguishes.
Maintenance and Installation
Externer_Akku_Anschluss.FH9
Batteries already charged
Batteries discharged
8-5
Battery pack
Akku_Anschluss.FH9

Advertisement

Table of Contents
loading

Table of Contents