Sharp TMV Series Service And Parts Manual page 32

Vertical mill
Table of Contents

Advertisement

(2) Replacement of Speed Change Belt (as shown in Figure 18):
a.
Refer to Step a to e of motor dismantling on P. 31.
b.
Take off draw bar (I).
c.
Dismantle the three hexagonal concave bolts (j) and use two of them (j) to life the bearing
housing (K).
d.
Remove from top the two hexagonal concave bolts (L), fixing the speed change plate, and
take off the bolt sleeves (M).
e,
Dismantle four hexagonal concave bolts (N)(O) and the two at the bottom (P).
f.
Take off the two hexagonal concave bolts (S) speed change housing (Q) and gear housing (R).
g.
Use a mallet and hit the upper belt housing (T) lightly so that it will break away from the fix
pin (U) for dismantling of the upper belt housing.
h.
When the speed change belt is replaced accordingly, restore the machine by reversing the
orders.
Note: The replaced speed change belt shall conform to that of out company specifications.
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents