3 - CHeCKLIst

Test operation in accordance with this check list.

3.1 - External visual inspection

3.2 - Verify field wiring and wiring of palladium cell heater

3.3 - Check of motor insulation resistance

3.4 - Check of control board safety and switch settings
3.5 - Check of purge pump
3.6 - Verify auxiliary equipment
3.7 - Bubble test
3.8 - Verify valve opening status and switch positions
3.9 - Verify control board parameters
3.10 - Pre-operation checks
3.11 - Operation and data record
3.12 - Sample of absorbent taken (for analysis)
3.1 - external visual inspection
Lower shell ............................................................................ Not damaged ®
Upper shell ............................................................................ Not damaged ®
Heat exchangers ................................................................... Not damaged ®
Evaporator headers ............................................................... Not damaged ®
Absorber headers .................................................................. Not damaged ®
Condenser headers ................................................................ Not damaged ®
Control panel ........................................................................ Not damaged ®
Absorption pump and isolation valves : ................................ Not damaged ®
Refrigerant pump and isolation valves ................................. Not damaged ®
Temperature sensors (11 sensors) ......................................... Not damaged ®
Generator pressure switches ................................................. Not damaged ®
Purge unit (diaphragm valves, liquid trap) ........................... Not damaged ®
Chilled-water flow switch .................................................... Not damaged ®
Cooling water flow switch (option) ...................................... Not damaged ®
Refrigerant blow-down valve ............................................... Not damaged ®
Purge tank pressure sensors .................................................. Not damaged ®
Palladium cells and heater .................................................... Not damaged ®
3.2 - Verify field wiring and wiring of palladium cell heater
Cooling water pump interlock (#121-#170) ......................... Not damaged ®
Chilled-water pump interlock (#120-#170) .......................... Not damaged ®
Run/stop remote signal (#323-#326) .................................... Not damaged ®
Stop indication (#352-#353) ................................................. Not damaged ®
Operation indication (#350-#351) ........................................ Not damaged ®
Alarm indication (#354-#355) .............................................. Not damaged ®
Chilled-water pump (#356-#357) ......................................... Not damaged ®
Cooling water pump (#358-#359) ........................................ Not damaged ®
Feedback indication (#362-#363) ......................................... Not damaged ®
Earth connection (#G/PE) .................................................... Not damaged ®
Wiring of palladium cell heater ............................................ Not damaged ®
For 460 V and 400 V: #232 and #0B on the control panel.
For 208 V: #232 and #202 on the control panel.
Hot-water control valve (4 to 20 mA: #345-#346) ............... Not damaged ®
Hot-water shut-off valve (#347-#348) .................................. Not damaged ®
3.3 - Check of motor insulation resistance
Standard: 10 MΩ mimum
Absorbent pump
Refrigerant pump
Purge pump
NOTE: Do not use this test for an electronic controller.
(24 V a.c.: #340-#344,#0)
:
____________MΩ .................... Good ®
:
____________MΩ .................... Good ®
:
____________MΩ .................... Good ®
Project name
:
Chiller model
:
Serial number
:
Commissioned by
:
Accepted by
:
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Damaged ®
Not good ‡ Repaired ®
Not good ‡ Repaired ®
Not good ‡ Repaired ®
____________________________
TSA-________________________
____________________________
___________ Date ____________
___________ Date ____________
Replaced ®
Replaced ®
Replaced ®
1 1

Advertisement

Table of Contents
loading

Table of Contents