LG ATNH09GRLE2 Svc Manual page 109

Hide thumbs Also See for ATNH09GRLE2:
Table of Contents

Advertisement

4. Trouble Shooting
6.7 Troubleshooting Outdoor Error
CH 23 (DC Link Voltage Low)
How to check PFCM IGBT (Diode Mode)
Sequence of
Measurement
Measurement
1
2
3
Copyright ©2013 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Normal
Standards
P-U
0.4V~0.6V
P-V
0.4V~0.6V
P-W
0.4V~0.6V
Sequence of
Measurement
Measurement
1
2
3
- 109 -
Normal
Standards
U-Nu
0.4V~0.6V
V-Nv
0.4V~0.6V
W-Nw
0.4V~0.6V
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents