Download Print this page

Power Down Procedure; Power Up Procedure - Mitsubishi Electric Apricot FT S Pentium Series Installation Manual

Advertisement

Power down procedure

If LOC Technology is in use, a user of appropriate authority
must be logged on before the system can be powered
down.
1. Push the
2. Confirm by pushing the button under the 'Y' on the
LCD display.
3. Isolate the internal UPS battery by setting the
BATTERY ISOLATION switch to the '0' position.
4. Unplug the mains power supply.

Power up procedure

1. Ensure that the battery isolation switch is in the '0'
position.
2. Plug in the mains power supply.
3. Set the BATTERY ISOLATION SWITCH to the '1'
position.
4. Push the POWER button.
5. Perform any required power-on security procedure.
4
button
STANDBY

Advertisement

loading