Preparations; Tools; Unpacking And Checking - Huawei ESS-240V12-9AhBPVBA Series Quick Installation Manual

Table of Contents

Advertisement

3

Preparations

Tools

3.1
Wire stripper
Heat gun
Protective gloves
Hydraulic pliers

Unpacking and Checking

3.2
1. Do not move the battery pack by holding its mounting brackets, front panel, or terminal cover.
2. Remove rings, watches, and other metal objects before you move a battery pack.
No.
Visually inspect the battery pack appearance for shipping damage. If any shipping
1
damage is found, report it to the carrier immediately.
Check the battery pack bar code, which is at the rear panel of the UPS, near the DC port,
and ensure that it complies with the order. If there is any discrepancy, contact your local
2
Huawei office immediately.
Polyvinyl chloride
(PVC) insulation tape
Cable tie
Electrostatic discharge
(ESD) gloves
Multimeter
Cotton cloth
Phillips screwdriver
(PH2 x 150 mm or PH3
x 250 mm)
Electrician's knife
Torque screwdriver
Item
3
Heat shrink tubing (Φ6)
Flat-head
screwdriver
Insulation gloves
Get installation tools
insulated to prevent
electric shocks.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents