Download Print this page

Frigidaire EFMIS155 User Manual page 8

Advertisement

Available languages

Available languages

7
Remove Metal
Base Bracket
With the unit on its side, remove the bottom metal
base bracket with nylon washer. Unscrew the axle
insert with a flathead screwdriver. Screw into the
opposite hole of the metal base bracket.
8
To reattach the door, place the door onto the bottom
axle insert. Place the top bracket into the door and
align the metal bracket holes over the holes in the
top of the unit cabinet. Tighten the three screws to
hold in place.
10
Reinstall the triangular bracket cover by carefully
threading the bracket cover onto the metal bracket
and pressing down.
IMPORTANT: It is extremely important to wait at least six hours before plugging the
beverage center into a power outlet. During the door reversal process, the refrigerant and
compressor oil fluids mixed. It is important to allow the refrigerant and compressor oil to separate
and settle so the compressor operates properly. Failure to do so will cause severe mechanical
problems, perhaps even the destruction of the unit's motor/compressor, and will void the warranty.
INSTALLATION
DOOR REVERSAL INSTRUCTIONS
Switch Axel
Insert Position
7a
Remove
screw and
re-insert
into the
opposite
side
Gently place the beverage on opposite side to
complete the door reversal. Remove screw and
re-insert into the opposite side. Re-attach the
metal base bracket with nylon washer on the
new hinge side. Lift the unit to an upright position.
9
The rubber gasket should be compressed on all
sides of the door. If the gasket is more compressed
on one side, the metal bracket position should be
adjusted. Make sure the door is level. Once the door
position is finalized, securely tighten the screws.
11
Reinstall all plastic hole insert plugs. The re-installation
of the plastic hole insert plugs is important to
maintain the seal and integrity of the insulation. Extra
inserts are included in case the plugs are damaged
during removal.
-
6
-

Hide quick links:

Advertisement

loading