Srn I/F: Standard; Rs232 I/F: Standard - Sharp ER-A770 Installation Manual

Pos terminal for "u"&"a" version
Hide thumbs Also See for ER-A770:
Table of Contents

Advertisement

10) Fastening onthe table:
Secure the Base cabinet
No.
NAME
Securing the UP-P16DP to the
Screw (M4 × 16)
wooden table
Securing the UP-P16DP to the
Screw (M4 × 20)
metal table
Securing the UP-P16DP to the
Nut
metal table
13
14
15
15
Fig. 19
Lowering the height of the UP-P16DP
Remove the standard Pole and attach the Base cabinet
Ratch
.
Fig. 20
using the screw.
USE
Q'ty
4
4
4
13
14
to the

16. SRN I/F: Standard

1) Connect to the SRN cable
2) Install the Ferrite core
to the SRN cable
3) Install the Nylon band
to the SRN cable
Using the terminal resistor (50 ohm: QCNCM7145RCZZ).
Insure that the system is terminated at each.
Fig. 21
Terminator
Trunk cables
50Ω
Branch
R
cables
(5m x 2)
16.4ft.
x 2
*Master
Satellite
Satellite

17. RS232 I/F: Standard

1) Connect the RS232 cable
2) Install the ferrite Core
to RS232 cable.
3) Install the ferrite core
to the cables.
Fig. 22
to the SRN connector
.
.
.
Terminator 50Ω
Cable conector
JJ conector
Satellite
Satellite
to the connector.
R

Advertisement

Table of Contents
loading

Table of Contents